Quote within 3 hours
Product Certification
Compliance Test Reports
SGS-issued SVHC screening for solid silicone compounds — 240+ restricted substances verified for EU market access.
Food-contact purity testing of food-grade silicone to FDA 21 CFR 177.2600.
Restricted substance compliance to EU Directive 2011/65/EU across all ten regulated substances.
Factory Documents
Factory scale, tooling base, equipment list and monthly capacity in one document.
The seven-step custom service flow, from drawing review to mass production.
Certificate
Factory Certificates
IATF 16949:2016
Issued by NQA
Automotive quality management system
APQP, PPAP and FMEA are in place — the prerequisite for entering automotive OEM supply chains.
ISO 9001:2015
Quality management system
Renewed through annual surveillance audits
Covers every stage from incoming material to final shipment inspection.
ISO 14001:2015
Environmental management system
VOCs emission treated to discharge standard
Industrial waste gas is adsorbed and purified before release.
Quality Control
How We Guarantee Every Batch
Incoming Inspection
Every batch of Shin-Etsu / Dow Corning compound is verified against its original COA — flowability, vulcanization curve, hardness, tensile strength and yellowing are tested before release to production.
In-Process Patrol
First-article three-check on every shift; mould temperature and cure time sampled every two hours; coating film thickness and cross-hatch adhesion tested per batch.
Final Inspection
100% deflashing and burr removal, CCD verification of silkscreen character offset, and full conductivity check on every assembled keypad.
Outgoing Audit
AQL 0.65 / 1.0 sampling, carton drop and vibration test, anti-static packing, and a signed inspection report issued with each shipment.
Five In-House Test Stations
- 012.5D optical vision measuring system
- 02Shore A digital rubber hardness tester
- 03Multi-station pneumatic keystroke fatigue tester
- 04RCA tape abrasion tester
- 05Eraser-type character abrasion tester
Verified Numbers
Certificates qualify the system. These controls are what every production batch actually goes through — send your drawing and we will confirm the inspection plan.
fromrubber-To provide you with silicone rubber professional advice and solutions
What we can promise
Make the samples out within 5days
Full quality Test Equipments
7~10days for Production Mold
Start Your Project Today!
- Phone
- *Title
- *Content
Sign Up Out Newletter

